Mice kept turning up in a Port Moody strata building
In spring 2023, a strata building in Port Moody was still dealing with mice in several units, even after earlier sealing and interior trapping. A separate contractor handled the proofing and the work inside the units. We handled the outside.
Our job was bi-weekly exterior rodent management across 23 stations around the building. The first visit was on May 12, 2023.
Shifting foundations behind the earlier proofing
In July 2023, the proofing contractor reassessed the building and reported that shifting foundations were letting mice in. They upgraded the proofing on the north side with perforated flashing. For the south side, they proposed sealing unit by unit as needed or re-quoting the whole side. At that point they reported seven units still had minor activity. In September they reported that the exterior proofing had sealed the building against mice, and that interior trapping was continuing for mice still inside and moving between units.
This is a common way a sealed building starts leaking again. When a foundation moves, it can open gaps that were not there when the original sealing was done. The building has changed underneath it, which is why reassessing the envelope matters more than assuming the first round still holds.
Twenty visits on a fixed exterior perimeter
Rodents tend to travel along walls and foundation edges, so stations set around the perimeter sit on the routes they use. We serviced the building's 23 stations every two weeks from May 2023 to February 2024, for 20 visits in all. The station count stayed at 23 for the whole program. In July, five stations were switched from mouse traps to rat traps.
In the final weeks we wound the program down. We collected the remaining interior equipment, picked up three stations being held on site, and collected the exterior traps on the last visit on February 13, 2024. The job closed three days later.
The Outcome
The strata hired us to run bi-weekly exterior rodent management across 23 stations. That program ran its full course and is complete.
Exterior station program completed
- The building's perimeter was covered by 23 serviced stations every two weeks from May 2023 to February 2024. That period included the north-side re-proofing and the September report that the exterior was sealed.
- The station setup was adjusted during the program, with five stations switched to rat traps in July.
- All of our equipment, including the remaining interior equipment and the exterior traps, was collected before the job closed in February 2024.
- The strata has 20 logged visits on file as a record of exterior coverage for the period.
When more than one contractor is working on a strata building, a clear scope helps everyone. Here the proofing contractor focused on the building envelope and the units, and our stations held the perimeter on a fixed schedule until the program was finished.
If your strata is dealing with recurring mice or rats, see our rodent control and strata property services.
Some photos on this page are representative photos from similar jobs our crews have done, not photos of this property.